Ethics Commission
City and County of San Francisco

City Officer: Lee, Edwin – Mayor – Filed: May 23, 2013 – Contractor: PG&E

Nature of Contract

Small Generator Electrical Interconnection Agreement for connecting the future SFPUC's University Mound Renewable Hydroelectric Project to PG&E lines. This interconnection facilitates moving the plants generated renewable electric to be another Hetch Hetchy electricity served facility. Scope includes PG&E final engineering, installation of PG&E electric meter equipment, and PG&E pre-parallel safety inspection services to assure a safe connection to PG&E power lines.

Date Contract Approved

May 21, 2013

Amount

$86,765.18

Form

Download Form

Was this page helpful?

Scan with a QR reader to access page:
QR Code to Access Page
https://sfethics.org/ethics/2013/06/city-officer-lee-edwin-mayor-filed-may-23-2013-contractor-pge.html