City Officer: Lee, Edwin – Mayor – Filed: January 22, 2014 – Contractor: NTK Construction

 

Nature of Contract

WW-596(E) Repair/Refurbish the fixed gas monitoring system in the existing Headworks facility located at the Southeast Water Pollution Control Plant.

Date Contract Approved

January 20, 2014

Amount

$225,000.00

Form

Download Form

Was this page helpful?

QR Code to Access Page

Scan the QR code with a mobile device camera to access the latest version of this document online:
https://sfethics.org/ethics/2014/01/city-officer-lee-edwin-mayor-filed-january-22-2014-contractor-ntk-construction.html