City Officer: Lee, Edwin – Mayor – Filed: April 19, 2012 – Contractor: BAE Systems San Francisco Ship Repair, a California Corporation

Nature of Contract

The purchase, construction, and installation of a 12 megawatt shoreside power system within the BAE San Francisco Ship Repair yard leasehold.

Date Contract Approved

4/19/12

Amount

$5,700,000

Form

Download form

Was this page helpful?

QR Code to Access Page

Scan the QR code with a mobile device camera to access the latest version of this document online:
https://sfethics.org/ethics/2012/04/city-officer-lee-edwin-mayor-filed-april-19-2012-contractor-bae-systems-san-francisco-ship-repair-a.html