Nature of Contract
WW-596(E) Repair/Refurbish the fixed gas monitoring system in the existing Headworks facility located at the Southeast Water Pollution Control Plant.
Date Contract Approved
January 14, 2014
Amount
$225,000.00
WW-596(E) Repair/Refurbish the fixed gas monitoring system in the existing Headworks facility located at the Southeast Water Pollution Control Plant.
January 14, 2014
$225,000.00
Scan with a QR reader to access page:
https://sfethics.org/ethics/2014/01/city-officer-board-of-supervisors-filed-january-16-2014-contractor-ntk-construction-inc.html